ALLOTMENT OF LAND FOR PUBLIC BODIES
*No.50. SHRI RASHEED MASOOD:
Will the Minister of URBAN DEVELOPMENT be
pleased to state:
(a)
The details of public bodies/public utility
services for which Government allots land at concessional rates;
(b)
the terms and conditions attached with such
allotments;
(c)
whether it is a fact that land has been allotted
to Mother Dairy, hospitals, schools, etc. in
(d)
if so, the details thereof; and
(e)
whether they are scrupulously observing the
terms and conditions attached with their allotments?
ANSWER
(SHRI JAIPAL REDDY)
**********
STATEMENT
STATEMENT
REFERRED TO IN REPLY TO RAJYA SABHA STARRED QUESTION No.50 FOR NOVEMBER 11,
2010 REGARDING ALLOTMENT OF LAND FOR PUBLIC BODIES
(a): Land is allotted at concessional rates to
local bodies, Government Departments and Government agencies for public utility
services viz. water, sewerage, electricity, solid waste management, drains,
etc. by Delhi Development Authority (DDA) and Land & Development Office
(L&DO) in National Capital Territory of Delhi.
(b): The terms and conditions of allotment
include the premium and ground rent to be paid, the purpose of allotment,
conditions regarding construction, sale, transfer, etc., provisions regarding
execution of lease deed, utilization of trees existing on the allotted land,
time limit for payment of dues, consequences of violation of terms and
conditions of allotment, etc. which are
elaborated in detail either through allotment letter or subsequently through
lease deed, Agreement of Lease or Memorandum of Agreement etc.
(c): The mode of allotment of land to
Societies (private institutions) for hospitals, schools and various other
institutional purposes has been changed from allotment at concessional rates’
to ‘auction’ mode by DDA However,
allotment of land to local bodies, Government Departments for hospitals and
schools etc. is continued to be made at concessional rates. L&DO allots land to Mother Dairy,
hospitals, schools etc. at concessional rates.
(d): The details of allotment made by DDA with
effect from 01.01.2005 are at Annexure-I.
The details of allotment made by L&DO during the last five years are
at Annexure-II.
(e): Allottees are required to adhere to the
terms and conditions of allotment.
Whenever any violation comes to the notice of DDA or L&DO,
appropriate action as per the provisions of terms and conditions of allotment,
lease deed, etc. is taken by the land allotting agencies.
************
ANNEXURE-I
ANNEXURE
REFERRED TO IN REPLY TO RAJYA SABHA STARRED QUESTION No.50* FOR NOVEMBER 11,
2010 REGARDING ALLOTMENT OF LAND FOR PUBLIC BODIES
DETAILS
OF LAND ALLOTTED BY DDA FOR PUBLIC UTILITY VIZ. (WATER, SEWERAGE, ELECTRICITY,
SOLID WASTE AND DRAIN ETC.).
Sl. No. |
Scheme/Locality |
Area |
Date of Allotment |
Organization to whom allotted |
|
1 |
Under Ground Water Resource and Pump House, |
1208 Sqm |
20.10.10 |
|
|
2 |
Underground Water Resource, Pkt-13, Sector-15,
Rohini. |
9700 Sqm |
01.08.05 |
-do- |
|
3 |
Underground /BPS, DDA Group Ashok Vihar, |
3000 Sqm |
11.09.06 |
-do- |
|
4 |
Construction of 11 KV ESS at Hastsal
Resettlement Colony |
20 Sqm. |
31.3.2005 |
Power Deptt. GNCTD |
|
5 |
Construction of 11 KV ESS at Hastsal
Resettlement Colony |
20 Sqm. |
31.3.2005 |
-do- |
|
6 |
Construction of 11 KV ESS at Hastsal
Resettlement Colony |
80 Sqm. |
31.3.2005 |
-do- |
|
7 |
Construction of 11 KV ESS at Hastsal
Resettlement Colony |
20 Sqm. |
31.3.2005 |
-do- |
|
8 |
Construction of 11 KV ESS at Hastsal
Resettlement Colony |
80 Sqm. |
31.3.2005 |
-do- |
|
9 |
Construction of 11 KV ESS at Hastsal
Resettlement Colony |
20 Sqm. |
31.3.2005 |
-do- |
|
10 |
Construction of 11 KV ESS at Vasant Kunj,
Ph-II |
80 Sqm. |
21.3.2005 |
-do- |
|
11 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
12 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
13 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
14 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
15 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
16 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
17 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
18 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
19 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
20 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
21 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
22 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
23 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
24 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
02.5.2005 |
-do- |
|
25 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
26 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
27 |
Construction of 66 KV ESS at Sector-10, Rohini
|
8550 Sqm. |
01.3.2005 |
-do- |
|
28 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
29 |
Construction of 11 KV ESS at Sector-18-B,
Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
30 |
Construction of 11 KV ESS at Sector-A,
Pocket-B and C, Vasant Kunj |
80 Sqm. |
05.4.2005 |
-do- |
|
31 |
Construction of 11 KV ESS at Pocket-5,
Sector-12, Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
32 |
Construction of 66 KV Grid Sub- Station at
Plot No.3-B-3, Sector-10 Rohini |
8550 Sqm. |
30.7.2007 |
-do- |
|
33 |
Construction of 66 KV ESS at of |
8550 Sqm. |
29.3.2005 |
-do- |
|
34 |
Construction of 11 KV ESS at Pocket-M & N,
Sarita Vihar |
80 Sqm. |
3.3.2005 |
-do- |
|
35 |
Construction of 11 KV ESS at Pocket-M & N,
Sarita Vihar |
80 Sqm. |
3.3.2005 |
-do- |
|
36 |
Construction of 66 KV ESS at Institutional
Area Vasant Kunj |
8550 Sqm. |
06.9.2006 |
-do- |
|
37 |
Construction of 11 KV ESS at Institutional
Area Vasant Kunj |
80 Sqm. |
06.9.2006 |
-do- |
|
38 |
Construction of 11 KV ESS at IFC Gazipur (13
Sub-Station) |
80 Sqm. each |
04.9.2005 |
-do- |
|
39 |
Construction of 11 KV ESS at Sector-12,
Pocket-2, Dwarka (Additional Land) |
28 Sqm. |
05.4.2005 |
-do- |
|
40 |
Construction of 11 KV ESS at Sector-12,
Pocket-2, Dwarka (Additional Land) |
52.50 Sqm. |
05.4.2005 |
-do- |
|
41 |
Construction of 11 KV ESS at Sector-6, Dwarka |
120 Sqm. |
04.5.2005 |
-do- |
|
42 |
Construction of 11 KV ESS at Pocket-B,
Sector-10, Dwarka |
80 Sqm. |
06.5.2005 |
-do- |
|
43 |
Construction of 11 KV ESS at CSC No.2,
Sector-10, Dwarka |
80 Sqm. |
05.4.2005 |
-do- |
|
44 |
Construction of 11 KV ESS at Loknayak
Puram (4 Sub-Station) |
80 Sqm. each |
02.5.2005 |
-do- |
|
45 |
Construction of 220 KV Grid ESS at Sector-19,
Dwarka |
28800 Sqm. |
02.2.2005 |
-do- |
|
46 |
Construction of 11 KV ESS at Pocket-4,
Sector-4, Dwarka (2 Sub-Station) |
80 Sqm. each |
04.5.2005 |
-do- |
|
47 |
Construction of 11 KV ESS at Sector-11, Dwarka |
99 Sqm. |
27.4.2005 |
-do- |
|
48 |
Construction of 11 KV ESS at Pocket-7, Sector-12, Dwarka (2 Sub-Station) |
80 Sqm.
each |
31.5.2005 |
-do- |
|
49 |
Construction of 11 KV ESS at Sector-19, Dwarka |
80 Sqm. |
06.11.2006 |
-do- |
|
50 |
Construction of 11 KV ESS at C& D Block,
Pocket-1, Shalimar Bagh |
16 Sqm. |
27.6.2005 |
-do- |
|
51 |
Construction of 11 KV ESS at Pocket-4,
Bindapur |
80 Sqm. |
09.11.2006 |
-do- |
|
52 |
Construction of 11 KV ESS at Pocket-B-10,
Sector-13, Dwarka (4 Sub-Station) |
80 Sqm.
each |
02.5.2005 |
-do- |
|
53 |
Construction of 66 KV ESS at Bakkarwala |
8550.91 Sqm. |
07.2.2006 |
-do- |
|
54 |
Construction of 11 KV ESS at Sector-11, Dwarka
(2 Sub-Station) |
80 Sqm. each |
18.5.2005 |
-do- |
|
55 |
Construction of 11 KV ESS at Pocket-3, Block-H,
Sector-18, Rohini |
16 Sqm. |
04.9.2005 |
-do- |
|
56 |
Construction of 220 KV ESS at Sector-29,
Rohini |
28800
Sqm. |
09.10.2007 |
-do- |
|
57 |
Construction of 33 KV ESS at Motia Khan |
2400 Sqm. |
19.5.2005 |
-do- |
|
58 |
Construction of 11 KV ESS at Motia Khan |
350 Sqm. |
19.5.2005 |
-do- |
|
59 |
Construction of 66 KV ESS at Sector-B-2,
Narela |
8550 Sqm. |
26.5.2005 |
-do- |
|
60 |
Construction of 11 KV ESS at Pocket-1,
Block-C, Sector-28, Rohini (2 Sub-Station) |
20 Sqm. each |
23.2.2006 |
-do- |
|
61 |
Construction of 11 KV ESS at Pocket-1,
Block-A, Sector-28, Rohini |
20 Sqm. |
04.5.2006 |
-do- |
|
62 |
Construction of 11 KV ESS at Pocket-3&4,
Block-A, Sector-28, Rohini (2 Sub-Station) |
20 Sqm. each |
23.2.2006 |
-do- |
|
63 |
Construction of 11 KV ESS at Pocket-5 &6,
Block-A, Sector-28, Rohini (2 Sub-Station) |
23 Sqm. each |
23.2.2006 |
-do- |
|
64 |
Construction of 66 KV Grid ESS at Shiv Vihar
J.J. Colony |
6611.85 Sqm. |
10.1.2007 |
-do- |
|
65 |
Construction of 11 KV ESS at Gokul Puri |
80 Sqm. |
03.11.2006 |
-do- |
|
66 |
Construction of 11 KV ESS at South of NH-24,
Mayur Vihar |
80 Sqm. |
03.1.2006 |
-do- |
|
67 |
Construction of 11 KV ESS at Block-R, Dilshad
Garden (2 Sub-Station) |
16 Sqm. each |
28.2.2006 |
-do- |
|
68 |
Construction of 11 KV ESS at Plot No. 1, OCF
Pocket Mandawali Fazal pur |
80 Sqm.
|
01.6.2006 |
-do- |
|
69 |
Construction of 11 KV ESS at Pocket-1,2,3, Block-A,
Sector-29, Rohini (4 Sub-Station) |
16 Sqm. each |
20.9.2007 |
-do- |
|
70 |
Construction of 11 KV ESS at Pocket-1,2,3,
Block-B, Sector-29, Rohini (4 Sub-Station) |
16 Sqm. each |
20.9.2007 |
-do- |
|
71 |
Construction of 66 KV ESS at Sector-23B,
Dwarka |
8550 Sqm. |
20.9.2007 |
-do- |
|
72 |
Construction of 11 KV ESS at Tahirpur (2 Sub-Station) |
80 Sqm. each |
14.3.2007 |
-do- |
|
73 |
Construction of 66 KV ESS at |
8550 Sqm. |
28.9.2006 |
-do- |
|
74 |
Construction of 11 KV ESS at Plot No.2&3,
Mandawali Fazal Pur (2 Sub-Station) |
80 Sqm. each |
20.9.2006 |
-do- |
|
75 |
Construction of 11 KV ESS at |
80 Sqm. |
05.9.2006 |
-do- |
|
76 |
Construction of 11 KV ESS at Motia Khan |
80 Sqm. |
12.10.2006 |
-do- |
|
77 |
Construction of 11 KV ESS at Block-B, Shalimar
Bagh (2 Sub-Station) |
16 Sqm. each |
13.4.2007 |
-do- |
|
78 |
Construction of 11 KV ESS at Block-A, Shalimar
Bagh |
16 Sqm. |
03.11.2006 |
-do- |
|
79 |
Construction of 11 KV ESS at Sector-B4,
Pocket-2&8, Narela (2
Sub-Station) |
16 Sqm. each |
25.4.2007 |
-do- |
|
80 |
Construction of 11 KV ESS at Sector-A5, Pocket-3&12,
Narela (2 Sub-Station) |
16 Sqm. each |
22.6.2007 |
-do- |
|
81 |
Construction of 11 KV ESS at Sector-A6,
Pocket-5&13, Narela (2
Sub-Station) |
16 Sqm. each |
25.5.2007 |
-do- |
|
82 |
Construction of 11 KV ESS at Pocket-3,4,5 and
6, Jasola (2
Sub-Station) |
80 Sqm. each |
25.5.2007 |
-do- |
|
83 |
Construction of 11 KV ESS at Keshav Pur Tenner
Colony (Vikas Puri) (6 Sub-Station) |
80 Sqm. each |
08.5.2007 |
-do- |
|
84 |
Construction of 11 KV ESS at Block-J,
Sector-16, Rohini |
16 Sqm. |
25.6.2007 |
-do- |
|
85 |
Construction of 66 KV ESS at Uttam Nagar |
4500 Sqm. |
30.7.2007 |
-do- |
|
86 |
Construction of 750 MW Gas Based Power Plant
at |
14.5 Hect. |
28.11.2007 |
-do- |
|
87 |
Construction of 11 KV ESS at North of |
16 Sqm. each |
27.11.2007 |
-do- |
|
88 |
Construction of 11 KV ESS at Block-3 and 4,
Motia Khan (2 Sub-Station) |
80 Sqm. each |
23.2.2010 |
-do- |
|
89 |
Construction of 11 KV ESS at Siras Pur for
Multi Storied (3 Sub-Station) |
16 Sqm. each |
08.1.2007 |
-do- |
|
90 |
Construction of 11 KV ESS at Pitampura near TV
Tower (2 Sub-Station) |
60 Sqm. each |
09.9.2008 |
-do- |
|
91 |
Construction of 11 KV ESS at Pocket-A,
Sector-16B, Dwarka |
80 Sqm. |
16.9.2008 |
-do- |
|
92 |
Construction of 11 KV ESS at LSC-1,
Sector-4, Dwarka |
80 Sqm. |
16.9.2008 |
-do- |
|
93 |
Construction of 11 KV ESS at Plot No.C, Block-A,
Vikas Puri |
80 Sqm. |
24.4.2009 |
-do- |
|
94 |
Construction of 11 KV ESS at Block-H,
Sector-18, Rohini |
16 Sqm. |
27.11.2009 |
-do- |
|
95 |
Construction of 11 KV ESS at Block-C & D, (4 Sub- Station) |
50 Sqm. each |
19.6.2009 |
-do- |
|
96 |
Construction of 11 KV ESS at East of Sector-D,
Pocket-6, Vasant Kunj (4 Sub-Station) |
80 Sqm. each |
19.3.2009 |
-do- |
|
97 |
Construction of 66 KV ESS at Vasant Kunj
Housing Scheme |
8550
Sqm. |
13.10.2009 |
-do- |
|
98 |
Construction of 11 KV ESS at Block-F, Gandhi
Vihar, Dheerpur (2 Sub-Station) |
48 Sqm. each |
13.5.2009 |
-do- |
|
99 |
Construction of 11 KV ESS at |
22.75 Sqm. |
03.11.2008 |
-do- |
|
100 |
Construction of 11 KV ESS at Molarband Housing
Scheme (3
Sub-Station) |
80 Sqm. each |
01.12.2009 |
-do- |
|
101 |
Construction of 11 KV ESS at Jasola for 1432 LIG Houses Scheme |
80 Sqm. |
17.8.2009 |
-do- |
|
102 |
Construction of 11 KV ESS at Pocket-10B,
Jasola for 330 LIG Houses Scheme (2 Sub-Station) |
80 Sqm. each |
17.8.2009 |
-do- |
|
103 |
Construction of 11 KV ESS at Kondli Gharoli
for 1350 EWS Houses Scheme (2 Sub-Station) |
80 Sqm. each |
23.2.2009 |
-do- |
|
104. |
Construction of 11 KV ESS at Behind D-6,
Vasant Kunj for 2304 Mega Housing Scheme
(25 Sub-Station) |
80 Sqm. each |
12.8.2009 |
-do- |
|
105. |
Construction of 11 KV ESS at Ashok Nagar Faze
Road |
80 Sqm. |
25.5.2010 |
-do- |
|
106 |
Construction of 11 KV ESS at Community Center
Sector-16, Rohini (2
Sub-Station) |
80 Sqm. each |
27.11.2009 |
-do- |
|
107 |
Construction of 66 KV Grid ESS at |
8550 Sqm. |
31.3.2010 |
-do- |
|
108 |
Construction of 990 KVA Transformer at
Maharana Pratap Bagh (Kanti Naga) |
37 Sqm. |
14.6.2010 |
-do- |
|
DETAILS OF
ALLOTMENT TO PUBLIC
Sl No. |
Name of work |
Area |
Date of allotment |
Organization to whom allotted |
1 |
Grade Separator at ISBT to |
10000 Sqm |
06.02.09 |
PWD |
2 |
Grade Separator |
6988 Sqm |
20.10.08 |
-do- |
3 |
|
46500 Sqm |
06.08.10 |
-do- |
4 |
Allotment of land for construction of 3 levels Grade Separator at Gazipur
of NH. 24, Road No. 56, Gazipur |
606 Sqm |
08.10.08 |
-do- |
5 |
Allotment of land for construction of Great
Separator at Mubarak Chowk. |
50747 Sqm |
08.06.06 |
-do- |
6 |
Construction of widening of Mehrauli -Mahipal
Road from Andheria More to Maksood Pur to 8 land with 75 mm Road |
29904 Sqm + 50937Sqm= 80841 Sqm |
19.04.10 |
-do- |
7 |
Construction of |
|
12.7.2010 |
-do- |
8 |
Madan Pur Khaddar |
5184 Sqm. 6077 Sqm. 7581 Sqm. |
01.6.2005 |
Education Deptt. GNCTD |
9 |
|
8000 Sqm. |
09.9.2005 |
-do- |
10 |
Sector-25, Rohini |
4050 Sqm. |
05.4.2005 |
-do- |
11 |
Sector-16-B, Dwarka |
8000 Sqm. |
08.2.2006 |
-do- |
12 |
Primary School Kalyan Vihar |
4000 Sqm. |
07.8.2006 |
-do- |
13 |
Sector-4, Rohini |
6052 Sqm. |
13.8.2010 |
-do- |
14 |
Primary School Pocket-3, Bindapur |
3178 Sqm. |
13.9.2006 |
-do- |
15 |
Sector-16, Pocket-A, Rohini |
2 Acre |
20.9.2006 |
-do- |
16 |
Sector-21, Rohini |
2 Acre |
20.9.2006 |
-do- |
17 |
Sector-23, Rohini |
2 Acre |
20.9.2006 |
-do- |
18 |
Sector-18, Rohini |
2 Acre |
20.9.2006 |
-do- |
19 |
Sector-13,Dwarka |
2 Acre |
20.9.2006 |
-do- |
20 |
Sector-22, Dwarka |
2 Acre |
20.9.2006 |
-do- |
21 |
Sector-7, Dwarka |
2 Acre |
20.9.2006 |
-do- |
22 |
Sector-15, Rohini |
2 Acre |
20.9.2006 |
-do- |
23 |
Nasir Pur |
8000 Sqm. |
28.6.2007 |
-do- |
24 |
Nasir Pur |
8000 Sqm. |
28.6.2007 |
-do- |
25 |
Primary School Pocket-5A, Sector-1, Dwarka |
4000 Sqm. |
04.7.2007 |
-do- |
26 |
Village Sannoth |
8000 Sqm. |
19.6.2008 |
-do- |
27 |
Buland Masjid, |
8000 Sqm. |
31.7.2008 |
-do- |
28 |
Primary School Pocket-4, Bindapur, Dwarka |
2000 Sqm. |
18.8.2008 |
-do- |
29 |
Sector-16B, Dwarka |
8000 Sqm. |
27.9.2010 |
-do- |
30 |
Maternity Home (Madanpur Khader) |
2532 Sqm. |
19.1.2006 |
Directorate
of Health Services GNCTD |
31 |
Construction of Hospital (Sarita Vihar) |
6319 Sqm. |
29.9.2006 |
-do- |
32 |
200 Bedded Hospital at Hastsal |
15139.15 Sqm. |
16.6.2006 |
-do- |
33 |
Construction of Dispensary at Pocket-3,
Bindapur |
1273 Sqm. |
03.8.2006 |
-do- |
34 |
Construction of Dispensary at Bank Enclave |
1000 Sqm. |
27.10.2006 |
-do- |
35 |
200 Bedded Hospital at Tri Nagar |
1.6 Hect. |
10.11.2006 |
-do- |
36 |
Health Centre at Sector4, Rohini |
1000 Sqm. |
20.2.2007 |
-do- |
37 |
Health Centre at Lahor Shashtri park |
1061 Sqm. |
14.8.2007 |
-do- |
38 |
200 Bedded Hospital at Dakshinpuri |
10000 Sqm. |
21.5.2008 |
-do- |
39 |
Dispensary at |
1000 Sqm. |
06.8.2008 |
-do- |
40 |
Dispensary / Health Centre at Sector-21 Rohini. |
811.600 Sqm,. |
06.06.2007 |
-do- |
41. |
Health Centre at Gandhi Vihar |
1000 Sqm. |
08.6.2009 |
-do- |
42. |
Dispensary in Vasant Gaon |
1000 Sqm. |
13.7.2009 |
-do- |
43 |
|
3.70 Hect |
14.5.2010 |
-do- |
44 |
Additional Land to |
1250 Sqm. |
23.8.2010 |
-do- |
45 |
Dispensary at Sakarpur |
1870 Sqm |
31.8.2010 |
-do- |
46 |
Community Hall at Geeta Colony, Block – 10 |
2074 Sqm |
9.5.08 |
MCD |
47 |
Community Hall at OCF Pkt in CGHS Mandawali Fazalpur in AC 43. |
763.685 Sqm |
25.6.07 |
-do- |
48 |
Community Hall at OCF Pkt in CGHS Mandawali Fazalpur near Patparganj Depot. |
965.85 Sqm |
25.6.07 |
-do- |
49 |
Community Hall at OCF Geeta
Colony Block – 12 East |
1301 Sqm |
11.12.06 |
-do- |
50 |
Community Hall at Vishwas Nagar |
1700 Sqm |
15.1.10 |
-do- |
51 |
Community Hall at Mayur Vihar, New Kondli at Pkt 6 MIG Float |
2042 Sqm |
3.9.09 |
-do- |
52 |
Community Hall at |
1593.63 Sqm |
17.6.09 |
-do- |
53 |
Community Hall at Gandhi Vihar |
1100 Sqm |
1.7.09 |
-do- |
54 |
Community Hall at East of Kailash |
743.80 Sqm |
23.1.09 |
-do- |
55 |
Community Hall at Block D, Sec.15, Rohini |
580 Sqm |
5.7.07 |
-do- |
56 |
Community Hall at Sec.3, Rohini |
653.275 Sqm |
1.12.06 |
-do- |
57 |
Community Hall at Sec.16, Rohini |
665 Sqm |
9.5.05 |
-do- |
58 |
Community Hall at Sec.24, Rohini |
1113.35 Sqm |
21.7.09 |
-do- |
59 |
Community Hall at Sec. 7 Rohini |
660 Sqm |
11.7.06 |
-do- |
60 |
Community Hall at Sec. 4 Rohini |
800 Sqm |
24.6.05 |
-do- |
61 |
Community Hall at Pkt A-7, Sec. 17, Rohini |
669 Sqm |
16.2.10 |
-do- |
62 |
|
85.65 Acre |
4.4.2009 |
Ministry
of External Affairs |
63 |
|
8000 Sqm. |
08.5.2009 |
|
******
DETAILS
OF LAND ALLOTTED TO MOTHER DAIRY
Sl. No. |
Scheme/Locality |
Area |
Date of Allotment |
Organization to whom allotted |
1 |
Hastsal Resettlement Colony |
25 Sqm. |
31.10.2005 |
Mother Diary |
2 |
KU Block Pitampura |
25 Sqm. |
15.3.2005 |
-do- |
3 |
Pocket-5, Mayur Vihar |
74.75 Sqm. |
27.4.2005 |
-do- |
4 |
LSC Sector-22, Dwarka |
74.75 Sqm. |
17.12.2007 |
-do- |
5 |
LSC Gazipur |
25 Sqm. |
01.2.2008 |
-do- |
6 |
Sector-3, Dwarka |
74.75 Sqm. |
01.3.2008 |
-do- |
7 |
OCF opposite Shekhar Society |
25 Sqm. |
01.2.2008 |
-do- |
8 |
C-10, Yamuna Vihar |
25 Sqm. |
06.2.2008 |
-do- |
9 |
Vasant Vihar |
25 Sqm. |
31.7.2008 |
-do- |
10 |
HAF Pocket-B, Sector-22, Dwarka |
25 Sqm. |
05.11.2007 |
-do- |
11 |
DDA Flats Motia Khan |
35.75 Sqm. |
31.7.2009 |
-do- |
12 |
Pocket-20C, Dwarka |
25 Sqm. |
21.4.2010 |
-do- |
13 |
Nasirpur |
25 Sqm. |
18.2.2008 |
-do- |
14 |
Sector-22, Rohini |
74.75 Sqm. |
15.3.2010 |
-do- |
15 |
Sector-11, Rohini |
25 Sqm. |
05.3.2010 |
-do- |
**********
DETAILS OF LAND ALLOTTED TO DMRC
Sl.
No. |
Scheme/Locality
|
Area |
Date
of Allotment |
1.
|
Construction of Janak Puri Metro Station |
11284.40
Sqm. |
09.3.2005 |
2.
|
Construction
of Guru Teg Bahadur, Kingsway Camp, Metro Station |
1000
Sqm. |
27.1.2005 |
3.
|
Construction
of |
1159
Sqm. |
08.7.2005 |
4.
|
Construction
of Jhangirpuri Metro Station |
12000
Sqm. |
08.6.2007 |
5.
|
Construction
of Ganesh Nagar Metro Station |
869.095
Sqm. |
14.10.2005 |
6.
|
Construction
of Janak Puri Metro Station (Additional Land) |
156.08
Sqm. |
08.4.2006 |
7.
|
Construction
of |
1633
Sqm. |
23.2.2007 |
8.
|
Construction
of Preet Vihar Metro Station |
700
Sqm. |
23.2.2007 |
9.
|
Construction
of Entry/Exit Gate of Peera Garhi Metro Station |
2770
Sqm. |
09.3.2007 |
10. |
Construction
of Traffic Integration at North of NH-10 |
5035
Sqm. |
09.3.2007 |
11. |
Construction
of Traffic Integration at North of NH-10 Near Nangloi |
22266
Sqm. |
09.3.2007 |
12. |
Construction
of Traffic Integration at North of NH-10 near J.J. Colony No.3, Nangloi |
271
Sqm. |
09.3.2007 |
13. |
Construction
of |
46479.03
Sqm. |
19.12.2006 |
14. |
Construction
of Malviya Nagar Metro Station |
12219.75
Sqm. |
20.6.2007 |
15. |
Construction
of Moolchand Metro Station |
3308.60
Sqm. |
14.11.2007 |
16. |
Construction
of Azad Pur Metro Station |
30000
Sqm. |
03.3.2006 |
17. |
Construction
of |
3912.5
Sqm. |
27.4.2007 |
18. |
Construction
of Entry Structure at Hauz Khas Metro
Station |
547.66
Sqm. |
02.4.2007 |
19. |
Construction
of New Ashok Nagar Metro Station |
4712
Sqm. |
24.7.2007 |
20. |
Construction
of Viaduct with Yamuna Bank-Anand Vihar |
226.839
Sqm. |
12.12.2006 |
21. |
Construction
of Traffic Integration, Inderlok – Mundka Corridor |
255.33
Sqm. |
11.1.2007 |
22. |
Construction
of Laxmi Nagar Metro Station |
216.59
Sqm. |
12.10.2007 |
23. |
Construction
of Karkardooma Metro Station |
1.85
Hect. |
09.11.2006 |
24. |
Construction
of |
1014
Sqm. |
04.7.2006 |
25. |
Construction
of Metro Station at MCIE |
7590
Sqm. |
26.9.2007 |
26. |
Construction
of 66 KV Underground Line at |
340
Sqm. |
23.2.2007 |
27. |
Construction
of Viaduct and Okhla Metro Station |
38856
Sqm. |
26.9.2007 |
28. |
Construction
of Badarpur Metro Station |
495
Sqm. |
29.8.2007 |
29. |
Construction
of Viaduct and Road Binding at Mundka |
440
Sqm. |
01.5.2007 |
30. |
Construction
of Saket Metro Station |
523.55
Sqm. |
16.5.2007 |
31. |
Construction
of Piers Viaduct and Station for Central Sectt.-Badarpur Corridor |
34417.86
Sqm. |
24.3.2008 |
32. |
Construction
of |
267.9
Sqm. |
20.8.2007 |
33. |
Construction
of |
123.890
Sqm. |
07.3.2007 |
34. |
Construction
of |
419.53
Sqm. |
18.3.2008 |
35. |
Construction
of |
796.48
Sqm. |
07.3.2008 |
36. |
Construction
of |
164.49
Sqm. |
05.3.2008 |
37. |
Construction
of Govind Puri Metro Station |
710.558
Sqm. |
24.6.2008 |
38. |
Construction
of Kirti Nagar Metro Station |
1058.80
Sqm. |
27.6.2008 |
39. |
Construction
of Piers of Viaduct of |
13.71
Sqm. |
30.6.2008 |
40. |
Construction
of Piers of Viaduct of |
39082
Sqm. |
30.6.2008 |
ANNEXURE-II
DETAILS
OF ALLOTMENTS MADE TO PUBLIC BODIES/PUBLIC UTILITY SERVICES BY L&DO
FOR THE LAST 5 YEARS BY L&DO.
S.No |
Name of Allottee |
Purpose
& site of allotments |
Date/Type of allotment |
Area ( Sqm) |
Rate of Land/ Licence Fee |
||||
MOTHER DAIRY |
|||||||||
1. |
Mother Dairy |
Fruit & Vegetable shop Sec-VII, R.K. Puram. |
29.05.2006/ Temporary |
42.42
|
Rs. 1149/per month |
||||
2. |
-do- |
-do-
Sector-VI, R.K. Puram. |
02.06.2006/-do- |
42.42
|
-do- |
||||
3. |
-do- |
-do- Sec-IX,
R.K. Puram. |
09.06.2006/-do- |
42.42
|
-do- |
||||
4. |
-do- |
Milk Booth West Kidwai
Nagar. |
05.10.2006/-do- |
09.00
|
Rs. 245/- |
||||
5. |
-do- |
Fruit,
Vegetable & Milk Booth , Baba Kharak Singh
Marg |
07.05.2007/-do- |
18.00
|
Rs. 490/- |
||||
6. |
-do- |
-do- |
19.12.2008/-do- |
09.00
|
Rs.245/- |
||||
7. |
-do- |
Fruit & Vegetable shop West Kidwai Nagar. |
24.12.2008/-do- |
09.00
|
Rs. 245/- |
||||
8. |
-do- |
Milk |
21.06.2010/-do- |
25.00
|
Rs. 680/- |
||||
DELHI METRO RAIL CORPORATION
(DMRC) |
|||||||||
1
|
DMRC |
Metro |
17.02.2006/ permanent |
400.00 |
Rs. 22.00 Lac/acre. |
||||
2
|
-do- |
-do-
Pragati Maidan. |
28.04.2006/
-do- |
2517.00 |
-do- |
||||
3
|
-do- |
-do- Indraprastha Power
Plant. |
02.05.2006. /-do- |
113.00 |
-do- |
||||
4
|
-do- |
-do- Pragati Maidan. |
03.05.2006/ -do-. |
6202.00 |
-do- |
||||
5
|
-do- |
-do- |
22.05.2007/ Temporary |
2000.00 |
-do- |
||||
6
|
-do- |
-do- |
28.05.2007/ Permanent |
1721.13 |
-do- |
||||
7
|
-do- |
-do- INA |
06.09.2007/ -do- |
1639.69 |
-do- |
||||
8
|
-do- |
-do- AIIMS |
06.09.2007/ -do- |
1022.72 |
-do- |
||||
9
|
-do- |
-do- |
09.10.2007/ Temporary |
2019.00 |
-do- |
||||
10 |
-do- |
-do- INA |
04.01.2008/ Permanent |
106.29 |
-do- |
||||
11 |
-do- |
-do- |
04.01.2008/ -do- |
2252.77 |
-do- |
||||
12 |
-do- |
-do- Near Safdarjang Airport |
24.01.2008/ -do- |
429.08 |
-do- |
||||
13 |
-do- |
-do-
Motilala Nehru & Maulana Azad Road. |
19.02.2008/ Temporary |
655.423 |
-do- |
||||
14 |
-do- |
-do-
Khan Market |
19.02.2008/ Permanent |
112.98 |
-do- |
||||
15 |
-do- |
-do-
Krishi Bhawan & Udyog Bhawan. |
02.04.2008/ Temporary |
8661.70 |
-do- |
||||
16 |
-do- |
-do-
Jangpura. |
02.04.2008/ Temporary |
11852.62 |
-do- |
||||
17 |
-do- |
-do-
Udyog Bhawan |
22.04.2008/ Permanent |
563.77 |
-do- |
||||
18 |
-do- |
-do-
G Block. |
30.04.2008/ -do- |
224.60 |
-do- |
||||
19 |
-do- |
-do-
Near Krishi Bhawan. |
07.05.2008/ Temporary |
788.00 |
-do- |
||||
20 |
-do- |
-do-
Jangpura |
15.05.2008/ Temporary |
6380.00 |
-do- |
||||
21 |
-do- |
-do
Khan Market. |
05.09.2008/ Temporary |
2704.012 |
-do- |
||||
22 |
-do- |
-do-
K. Kamraj Marg. |
02.11.2008/ Permanent |
|
-do- |
||||
23 |
-do- |
-do-
Airport Link |
21.11.2008/
Permanent |
16784.00 |
-do- |
||||
24 |
-do- |
-do-
Krishi Bhawan |
19.02.2009/ Temporary |
2457.37 |
-do- |
||||
25 |
-do- |
-do-
Dayal Singh College. |
13.03.2009/ Permanent |
4447.82 |
-do- |
||||
26 |
-do- |
-do-
|
06.04.2009/ Temporary |
10020.00 |
-do- |
||||
27 |
-do- |
-do-
|
14.01.2010/ Permanent |
5042.00 |
-do- |
||||
OIL PSUS/INDRAPRASTHA GAS LIMITED
(IGL) |
|||||||||
1
|
IGL |
CNG Station
San Martin Marg |
30.06.2006/ Temporary |
1143.30 |
Rs.642449/ annum Increase of 8% per annum |
||||
2
|
-do- |
-do- Sarojini Nagar. |
-do- |
1080.00 |
Rs.606879/ annum Increase of 8% per annum |
||||
3
|
-do- |
-do- Shanti Path |
-do- |
1080.00 |
-do- |
||||
4
|
-do- |
-do- |
-do- |
1080.00 |
-do- |
||||
5
|
-do- |
-do- Sector-III, R.K.Puram. |
16.04.2007/ Temporary |
1080.00 |
-do- |
||||
6
|
-do- |
-do- DIZ Area |
18.04.2007/ Temporary |
1080.00 |
-do- |
||||
7
|
-do- |
-do- Sector-X, R.K.Puram. |
-do- |
1080.00 |
-do- |
||||
8
|
-do- |
-do-
Purana Quilla Nanagal Machi |
-do- |
1080.00 |
-do- |
||||
LOCAL BODIES/GNCTD |
|||||
1
|
NDMC |
Multilevel Parking. K.G.Marg. |
29.01.2009/ Permanent |
6143.00 |
Rs. 11000/acre. |
2
|
MCD |
Parking. Kushak Nallah, JN
Stadium. |
07.12.2009/ Permanent |
94.22
|
NIL. |
3
|
-do- |
|
06.01.2010/ Permanent |
296
sqm. |
NIL. |
4
|
NDMC |
Parking Sarojini Nagar. |
21.07.2010/ Permanent |
094
acre |
Rs. 57,906 per acre |
OTHERS |
|
||||
1
|
UNICEF |
Office Lodi Estate area. |
15.05.2008/ Temporary |
0.55847. |
Rs. 1,14,570/= towards depreciated cost
of the structures standing on bungalow No. 73 & 74 Lodhi Estate. |
2
|
World Bank |
Office |
12.11.2009/ Permanent |
3633.16 |
Rs.88.00 lac/ acre. |
3
|
CPWD |
Rajya Sabha MP Flats, |
Transferred to CPWD |
|
|
4
|
ASI |
Archaeological purpose, Humayun Tomb. |
13.11.2009. / Permanent. |
12.156
acre |
Ra.1/acre. |
********