ANNEXURE
ANNEXURE REFERRED TO IN REPLY TO PARTS (b) TO (e) OF
RAJYA SABHA UNSTARRED QUESTION NO.3149 FOR ANSWER ON 25TH AUGUST,
2010 ASKED BY SHRI RAMDAS AGARWAL REGARDING MECHANISM FOR DETERMINING TOLL TAX
ON NHs.
---------------------------------------------------------------------------------------------------------------------
(b) to
(c) For the section of National
Highways, permanent bridge or temporary bridge, as the case may be, for the use
of which the user fee is levied in accordance with the National Highways Fee
(Determination of Rates and Collection) Rules, 2008 which were notified on
05.12.2008. The rates are revised
annually, based on 3% annual increase plus 40% of increase in WPI over the WPI
of 6th January, 2007. The details of rate of increase/revision of
toll tax during each of the last three years are given
at Appendix-I
(d) to (e) National Highways Fee (Determination
of Rates and Collection) Rules, 2008 (NH Fee Rules, 2008) provides that no fee
shall be levied for the use of the section of national highway, permanent
bridge, bypass or tunnel, as the case may be, by two wheelers, three wheelers,
tractors and animal drawn vehicles provided that no service lane or alternate
road is available. NH Fee Rules, 2008
also prescribe that a toll plaza shall be established beyond a distance of ten
kilometers from a municipal or local town area limits, resulting in exclusion
from paying user fee (toll) by the local vehicles. In case a toll plaza is established for
specific reasons within the municipal or town area limits or within five
kilometers from such limits, primarily for use of the residents of such
municipal or town area, user can avail discounts as prescribed in Rule 9(2) of
the NH Fee Rules, 2008 as under:-
Amount
payable |
Maximum number of one way
journeys allowed |
Period
of validity |
One and half times of the fee for one way journey |
Two |
Twenty four hours from the time of payment |
Two-third of amount of the fee payable for fifty single
journeys. |
Fifty |
One month from date of payment |
Under NH Fee
Rules,
|
|
|
|
|
|
Detail of Increased Rate of Fee For Bridge/ bypass/ Tunnel
|
|||||
|
(Rupees per vehicle per trip) |
||||
A. For 2007-2008 |
|||||
Cost of permanent bridge, bypass or tunnel (Rupees in
crore) |
Car, Jeep, Van or Light Motor Vehicle |
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus |
Truck or Bus |
HCM, EME or MAV |
Oversized Vehicle |
10 to 15 |
5.00 |
7.50 |
15.00 |
22.00 |
30.00 |
For every additional Rupees five
crore or part thereof, exceeding Rupees fifteen crore and up to Rupees one
hundred crore. |
1.00 |
1.50 |
3.00 |
4.50 |
6.00 |
For every additional Rupees five
crore or part thereof, exceeding Rupees one hundred crore and upto Rupees two hundred crore |
0.75 |
1.15 |
2.25 |
3.40 |
4.50 |
For every additonal
Rupees five crore or part thereof, exceeding Rupees two hundred crore |
0.50 |
0.75 |
1.50 |
2.25 |
3.00 |
This is a base year. The National
Highways Fee (Determination of Rates and Collection) Rules, 2008 were
notified on 05.12.2008. The rates are revised annually based on 3% annual
increase plus 40% of increase in WPI over the WPI of 6th January, 2007. |
|||||
B. 2008-2009 |
|||||
Cost of permanent bridge, bypass or tunnel (Rupees in
crore) |
Car, Jeep, Van or Light Motor Vehicle |
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus |
Truck or Bus |
HCM, EME or MAV |
Oversized Vehicle |
10 to 15 |
5.24 |
7.86 |
15.71 |
23.05 |
31.43 |
For every additional Rupees five
crore or part thereof, exceeding Rupees fifteen crore and up to Rupees one
hundred crore. |
1.05 |
1.57 |
3.14 |
4.71 |
6.29 |
For every additional Rupees five
crore or part thereof, exceeding Rupees one hundred crore and upto Rupees two hundred crore |
0.79 |
1.20 |
2.36 |
3.56 |
4.71 |
For every additonal
Rupees five crore or part thereof, exceeding Rupees two hundred crore |
0.52 |
0.79 |
1.57 |
2.36 |
3.14 |
% increase from previous year |
4.76 |
||||
C. 2009-2010 |
|||||
Cost of permanent bridge, bypass or tunnel (Rupees in
crore) |
Car, Jeep, Van or Light Motor Vehicle |
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus |
Truck or Bus |
HCM, EME or MAV |
Oversized Vehicle |
10 to 15 |
5.51 |
8.26 |
16.52 |
24.24 |
33.05 |
For every additional Rupees five
crore or part thereof, exceeding Rupees fifteen crore and up to Rupees one
hundred crore. |
1.10 |
1.65 |
3.30 |
4.96 |
6.61 |
For every additional Rupees five
crore or part thereof, exceeding Rupees one hundred crore and upto Rupees two hundred crore |
0.83 |
1.27 |
2.48 |
3.75 |
4.96 |
For every additonal
Rupees five crore or part thereof, exceeding Rupees two hundred crore |
0.55 |
0.83 |
1.65 |
2.48 |
3.30 |
% increase from previous year |
5.16 |
||||
D. 2010-2011 |
|||||
Cost of permanent bridge, bypass or tunnel (Rupees in
crore) |
Car, Jeep, Van or Light Motor Vehicle |
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus |
Truck or Bus |
HCM, EME or MAV |
Oversized Vehicle |
10 to 15 |
5.86 |
8.80 |
17.59 |
25.80 |
35.18 |
For every additional Rupees five
crore or part thereof, exceeding Rupees fifteen crore and up to Rupees one
hundred crore. |
1.17 |
1.76 |
3.52 |
5.28 |
7.04 |
For every additional Rupees five
crore or part thereof, exceeding Rupees one hundred crore and upto Rupees two hundred crore |
0.88 |
1.35 |
2.64 |
3.99 |
5.28 |
For every additonal
Rupees five crore or part thereof, exceeding Rupees two hundred crore |
0.59 |
0.88 |
1.76 |
2.64 |
3.52 |
% increase from previous year |
6.46 |
||||
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
***** |
|||||
|
|
|
|
|
|