Sl.
No. |
Name
of the project |
City |
State |
Project cost (Rs.
in crore) |
|
1. |
Extension
of |
|
U.P. |
320 |
|
2. |
Extension
of |
|
Haryana |
2028 |
|
3 |
|
|
|
24,418 |
|
4. |
|
|
Kerala |
2991.5 |
|
5. |
|
|
Andhra
Pradesh |
12132 |
(c): The
status of work on the projects already given clearance with details are given
at Annexure-I.
ANNEXURE-I
Annexure
referred to in reply to Rajya Sabha
Unstarred Question No.3804 for 29.4.2010
|
Project |
Total
length (km) |
Total cost
(Rs. in crore) |
Status/completion
date |
|
|
10571 |
|
|
|
Shahdara to Rithala |
22.00 |
31.3.2004 |
|
|
Vishwa
Vidhyalaya to Central Secretariat |
11.00 |
3.7.2005 |
|
|
|
22.80 |
11.11.2006 |
|
|
Barakhamba Road-Indraprasta |
2.80 |
||
|
Extension
of Line 3 into |
6.50 |
1.4.2006 |
|
|
Total |
65.10 |
||
|
|
8605.36 |
|
|
|
Vishwa
Vidyalaya-Janakpuri |
6.36 |
|
4.2.2009 |
|
Central
Secretariat –Qutab Minar |
12.53 |
30.6.2010 |
|
|
|
3.09 |
4.6.2008 |
|
|
Indraprasta-New Ashok Nagar |
8.07 |
10.5.2009 |
|
|
Yamuna
Bank-Anand Vihar ISBT |
6.17 |
6.1.2010 |
|
|
Inderlok-Mundka |
18.46 |
3.4.2010 |
|
|
Dwarka
Sector-9 to Dwarka Sector-21 |
2.76 |
275.00 |
30.9.2010 |
|
Qutab
Minar-Arjan Garh-Sushant Lok (Gurgaon) |
14.47 |
1581.00 |
30.6.2010 |
|
New
Ashok Nagar – Sector-32 (Noida) |
7.00 |
827.00 |
12.11.2009 |
|
Central
Secretariat- Badarpur |
20.01 |
4012.00 |
30.9.2010 |
|
Airport
Express Link from N.D.Rly.Station to Airport |
19.50 |
3076.00 |
30.9.2010 |
|
Dwarka
Sector-21 to Airport |
3.50 |
793.00 |
30.9.2010 |
|
Total |
121.92 |
19169.36 |
|
|
|
42.3 |
8158.00 |
Bangalore
Metro Rail Project is being implemented from January, 2007 and the approved
completion date is September, 2012.
The physical achievement as the end of March, 2010 is 22.54%. As at the end of March, 2010 the
expenditure on the project is Rs.2267.57 crore. |
|
Mumbai
Metro Rail Project |
146.50 |
2356.00 |
Mumbai
Metro Line-1: Varsova-Andhehri-Ghatkopar-Corridor
(11.07 km):- 55% overall work is completed so far and as per Concession
Agreement the target date of commissioning the system is March 2012. Mumbai
Metro Line-II: Charkop-Bandra-Mankhurd Corridor (32
km):- The Concession Agreement for this Metro Line between GoM and SPV (Mumbai Metro Transport Private Limited) was
signed on 21.01.2010. The target date
of commissioning is 2013-14. |
|
Chennai
Metro Rail Corporation Ltd. |
45.046 |
14600.00 |
Targeted
for completion in 2014-2015 |
|
Kolkata
Metro Rail Corporation Ltd. |
18.65 |
4874.58 |
Targeted
for completion in 2014-15. |